Location:
Belgrade
Client:
BAS AD
Still in work:
2019 - 2022
Type of object:
New BAS station
Installed capacity:
About 2MW
Design:
Geological surveys, Equipping and connecting wells
Services performed:
Construction, equipping and connecting wells
Permits:
Obtaining exploitation rights - ongoing
Geological surveys, Equipping and connecting wells
Services performed:
Construction, equipping and connecting wells
Permits:
Obtaining exploitation rights - ongoing
NEW BUS STATION - Belgrade
For heating/cooling of the new bus station in Block 42 in Novi Beograd, sub-hydrogeothermal resources will be used. From 2019 to 2022, 6 exploitation-injection wells were drilled, with a dual function, all with the aim of achieving the "Aquifer Thermal Energy Storage (ATES)" effect.
The wells were drilled using rotary drilling method, with reverse circulation of drilling fluid, to a depth of 40 m.
Let’s work together !
The wells were drilled using rotary drilling method, with reverse circulation of drilling fluid, to a depth of 40 m.