Location:
                New Belgrade - Serbia
              
              
                Client:
                West 65 Beograd
              
              
                Completed:
                2019 - 2021
              
            
                Type of Geothermal Energy:
                Hydrothermal Energy, 1 operational well 500m deep
              
              
                Installed capacity:
                Approximately 500KW
              
            
                Design:
Geological surveys, well equipping and connecting
Execution:
Well equipping
Supervision:
Well drilling
            Geological surveys, well equipping and connecting
Execution:
Well equipping
Supervision:
Well drilling
WEST 65 TOWER – NEW BELGRADE
        In 2021, the expert team from Quince M Pro carried out works on the equipment of the West65Terme-1 thermal well.
The thermal well is 500m deep. Two submersible well pumps were installed at a depth of 60m for the exploitation of thermal mineral water in the well.
        
        Let’s work together !
      The thermal well is 500m deep. Two submersible well pumps were installed at a depth of 60m for the exploitation of thermal mineral water in the well.
 QUINCE M PRO
QUINCE M PRO 
               
              