Location:
New Belgrade
Client:
Sakura Energy
Completed:
2019 - 2021
Type of geothermal energy:
Hydrogeothermal energy, 2 exploitation wells, 3 recharge wells
Installed capacity:
Approximately 1 MW
Design:
Geological surveys, Drainage of groundwater during construction
Permits:
Obtaining exploitation rights
Geological surveys, Drainage of groundwater during construction
Permits:
Obtaining exploitation rights
SAKURA PARK NEW BELGRADE
For the purpose of air conditioning, the residential-commercial complex "Sakura Park" uses sub-hydrogeothermal energy. A total of 5 wells have been drilled with depths of up to 40m.
The Quince M Pro team participated in the preparation of the project-technical documentation. By creating a mathematical model of groundwater flow and determining the correct disposal, a dual function of the wells was achieved. In the first phase, they were used to lower the level of groundwater during construction, and in the second phase, they are used for the exploitation of geothermal resources.
Let’s work together !
The Quince M Pro team participated in the preparation of the project-technical documentation. By creating a mathematical model of groundwater flow and determining the correct disposal, a dual function of the wells was achieved. In the first phase, they were used to lower the level of groundwater during construction, and in the second phase, they are used for the exploitation of geothermal resources.